Annoyed. Why have a Project Slack if the following conditions apply:
1) Admins don't reply to questions
2) One admin replies to a question, and then a day later another admin replies with a totally different and contradictory answer to the same question.
3) They post an update clarifying FINALLY how things should be done going forward then
4) Another answer pops up 2 days later saying you should do it the way it was done before the announcement.
Of course none of this is cleaned up so you search the Slack and end up with 5 answers or announcements any one of which could be the right one.
They are mad on workers labelling which project ID we are referring to, but when it comes to answering questions they use lazy language like "Use x for this project for now" which could be referring to 3 different projects on that Slack channel. IT experts again, can work miracles with tech but their written expression leaves a lot to be desired.
So when they don't answer a question is it because a) It's too stupid a question to deign to answer it? or b) they've completely missed the question? or c) they just can't be arsed?
Takes the joy out of work some days as I'm ploughing on with a nag at the back of my mind that I'm doing something wrong despite having asked for clarity five times!
The joys of tech! My very first job was cleaning up IT documentation, rewriting it and turning it into end user instructions, back in 1990s, I didn't think I'd end up back in tech at this point in my life but it seems while much has changed, some things are still the same!